We checked our own design three ways. Ten problems came out.

38
sources read before the first drawing
10
findings against version 1
13
claims proven on version 2
0
trucks tested so far

A tracker for trucks, designed in two nights

On 3 and 4 November we designed a product of our own: a tracker for heavy trucks and vans, Morocco first. It reads the vehicle on its diagnostics connector, decides on board with small edge models, and sends what matters to a datacenter.

No truck has been tested. Every decision below is still a proposal that a person has to accept or reject. We publish the design journal anyway, because of what happened between version 1 and version 2.

Research changed the product before any drawing

Research came first: 38 sources and 7 written constraints. Three facts reshaped the design.

Our search found no commercial LTE-M or NB-IoT offer in Morocco. The low-power radio that most trackers rely on may not be available here, so the design uses LTE Cat 1 bis until an operator tells us otherwise.

As we read CNDP deliberation 17-2014 on vehicle geolocation, a driver's maximum speed may not be processed. Driver scoring therefore scores harsh events and idling. Not speed.

A cab reaches 70 °C in the sun. Lithium cells charge only up to about 45 °C.

Version 1 looked serious

A lithium backup cell for eight hours of reporting after a power cut. One SIM operator. Firmware updates installed when the vehicle is parked. A review by people who agree with each other would have passed it.

We checked it three ways instead. A state exploration walks through every situation the device can be in. A numeric check tests the budgets: current, capacity, temperature. A resilience analysis removes one component at a time and watches what falls. Ten findings came out.

Findings
Three independent checks, ten findings, one weak spot
State exploration 4 findings
Walks through every situation the device can be in.
Out of coverage, the alarm dies with the battery.
A long coverage gap fills the flash and drops events.
Power is cut while a firmware image is being written.
The ignition comes on in the middle of an install.
Numeric check 3 findings
Tests the budgets: current, capacity, temperature.
At a real 19.5 mA in sleep, a parked van may not start after 13 days.
No allowed cab temperature is under the lithium charging limit.
170 mAh cannot give eight hours of reporting.
Resilience analysis 3 findings
Removes one component at a time and watches what falls.
Cutting the vehicle power takes down the power-cut alarm itself.
One SIM operator stops every critical function. Two findings.
The device alone cannot promise the power-cut alarm.
Version 1 passed a normal review. Each check attacked it from a different side, and all three ended on the same promise.

Three checks pointed at the same weak spot from three sides. The device alone could not promise the power-cut alarm.

Version 2

The guarantee was split in two. A supercapacitor, rated for the heat, sends one last alarm. The datacenter declares a tracker silent after missed heartbeats.

Proving that design produced a new counterexample. Unplug the tracker and plug it back: the ignition messages counted as heartbeats while the alarm was still waiting. The rule that came out of it is now part of the protocol. Every message carries the pending critical events first, and a heartbeat counts only once it has reached the network.

The rest followed. Two firmware slots, with installation only when parked on vehicle power. Reserved slots for critical events, with 48 hours of queue proven to fit in half the flash. A sleep current target of 2 to 6 mA at 12 V. Two operator profiles on an eSIM.

Before and after
What changed between version 1 and version 2
Question
Version 1
Version 2
Power-cut alarm
V1A lithium cell reports for eight hours.
V2A supercapacitor sends one last alarm. The datacenter declares the tracker silent after missed heartbeats.
Coverage gap
V1Events are dropped when the flash fills.
V2Critical events have reserved slots. 48 hours of queue fit in half the flash.
Firmware update
V1Installed when the vehicle is parked.
V2Two slots. Installs only when parked on vehicle power, and stops at once on ignition or power cut.
Sleep current
V119.5 mA, enough to drain a parked van.
V2A target of 2 to 6 mA at 12 V, to be measured.
Connectivity
V1One SIM operator.
V2Two operator profiles on an eSIM.
Every line of version 2 answers a finding. The sleep current is still a target: nobody has measured it on a bench.

Thirteen claims now hold, each with a certificate. Four properties were also checked against a deliberate defect, and each one caught it. A proof that cannot fail proves nothing.

From proof to firmware

The proven state machine was generated into C++17. Five truck situations replayed on a workstation pass 13 checks. The same core, cross-compiled for a small microcontroller board, is a 125 KB image for the pilot rig.

One lesson from that step. A sensor reading enters the model's world at the next tick, so "one step after the ignition comes on" in the proof is two ticks of real time. One test in the truck plan measures exactly that.

What is not proven

A proof covers the model, not the truck. The sleep current is a target and nobody has measured it on a bench. The radio choice rests on a search, not on an operator's answer. And two single points of failure are accepted for the pilot: the device itself, and the one datacenter site.

What remains is physical. Build the rig, measure the sleep current, run the tests in a truck.

Let's structure your next intelligent system.